Home  »  Resources  »  Consultation  »  Model Operating Requirements Guidance Notes

Model Operating Requirements Guidance Notes

The Operating Requirements in each State and Territory apply to Electronic Lodgment Network Operators (ELNO). They determine the standards ELNOs must comply with when applying to operate, prior to commencing operations and on an ongoing basis once approved to operate.

ARNECC’s Model Operating Requirements provide the basis for each State’s and each Territory’s Operating Requirements. The Intergovernmental Agreement between the States and Territories commits them to having regard for the Model Operating Requirements when making their respective Operating Requirements.

ARNECC’s MOR Guidance Notes provide advice and assistance to ELNOs in their compliance with the Operating Requirements.

Consultation with industry stakeholder groups and participants plays a key role in ensuring the MOR Guidance Notes reflect the expectations of all those depending on the services provided by ELNOs.

When consultation is open on proposed amendments to the MOR Guidance Notes, written submissions can be made to chair@arnecc.gov.au by the due date.


Published Consultation
Version 3 Model Operating Requirements Guidance Notes Version 3 Consultation Draft Clean
This draft proposes amendments to the MOR Version 2 Guidance Notes to align with the Model Operating Requirements Version 3.
20/01/2015 Closed
Model Operating Requirements Guidance Notes Version 3 Consultation Draft Marked-up
This draft shows the amendments proposed to the MOR Version 2 Guidance Notes to align with the Model Operating Requirements Version 3.
20/01/2015 Closed
Version 2 Model Operating Requirements Guidance Notes Version 2 Consultation Draft Clean
This draft proposes the initial version of the MOR Guidance Notes aligned with the Model Operating Requirements Version 2.
20/01/2014 Closed