Model Operating Requirements
The Operating Requirements in each State and Territory apply to Electronic Lodgment Network Operators (ELNO). They determine the standards ELNOs must comply with when applying to operate, prior to commencing operations and on an ongoing basis once approved to operate.
ARNECC’s Model Operating Requirements provide the basis for each State’s and each Territory’s Operating Requirements. The Intergovernmental Agreement between the States and Territories commits them to having regard for the Model Operating Requirements when making their respective Operating Requirements.
Consultation with industry stakeholder groups and participants plays a key role in ensuring the Model Operating Requirements are suited to each State’s and each Territory’s requirements.
When consultation is open on proposed amendments to the Model Operating Requirements, written submissions can be made to chair@arnecc.gov.au by the due date.
Version | Title | Published | Consultation |
---|---|---|---|
Version 6 | Model Operating Requirements Version 6 Consultation Draft 6.1 Clean This draft proposes further amendments to the Model Operating Requirements Version 5. Review pending. |
09/10/2020 | Closed |
Model Operating Requirements Version 6 Consultation Draft 6.1 Marked-up This draft proposes further amendments to the Model Operating Requirements Version 5. Review pending. |
09/10/2020 | Closed | |
Model Operating Requirements Version 6 Consultation Draft 6 Clean This draft proposes amendments to the Model Operating Requirements Version 5. |
18/12/2019 | Closed | |
Model Operating Requirements Version 6 Consultation Draft 6 Marked-up This draft proposes amendments to the Model Operating Requirements Version 5. |
18/12/2019 | Closed | |
Version 5 | Model Operating Requirements Version 5 Consultation Draft 5.1 Clean This draft proposes further amendments to the Model Operating Requirements Version 4. |
05/09/2018 | Closed |
Model Operating Requirements Version 5 Consultation Draft 5.1 Marked-up This draft proposes further amendments to the Model Operating Requirements Version 4. |
05/09/2018 | Closed | |
Model Operating Requirements Version 5 Consultation Draft Clean This draft proposes amendments to the Model Operating Requirements Version 4. |
16/03/2018 | Closed | |
Model Operating Requirements Version 5 Consultation Draft Marked-up This draft proposes amendments to the Model Operating Requirements Version 4. |
16/03/2018 | Closed | |
Version 4 | Model Operating Requirements Version 4 Consultation Draft Marked-up This draft shows the amendments proposed to the Model Operating Requirements Version 3. |
15/11/2016 | Closed |
Model Operating Requirements Version 4 Consultation Draft Clean This draft proposes amendments to the Model Operating Requirements Version 3. |
15/11/2016 | Closed | |
Version 3 | Model Operating Requirements Version 3 Consultation Draft Clean This draft proposes amendments to the Model Operating Requirements Version 2. |
20/01/2015 | Closed |
Model Operating Requirements Version 3 Consultation Draft Marked-up This draft shows the amendments proposed to the Model Operating Requirements Version 2. |
20/01/2015 | Closed | |
Version 2 | Model Operating Requirements Version 2 Consultation Draft Clean This draft shows amendments to the Model Operating Requirements Version 1. |
07/01/2014 | Closed |
Model Operating Requirements Version 2 Consultation Draft Marked-up This draft shows the amendments proposed to the Model Operating Requirements Version 1. |
07/01/2014 | Closed | |
Version 1 | Model Operating Requirements Version 1 Consultation Draft This draft proposes the initial version of the Model Operating Requirements. |
02/04/2012 | Closed |